库存调整日期Date Inventory Adjust
作废日期D ate Obsolete
收到日期Date Received
交付日期Date Released
需求日期Date Required
发货日期Date to Pull
空负荷Dead Load
需求管理Demand Management
需求Demand
实际能力Demonstrated Capacity
非独立需求Dependent Demand
直接增减库存处理法Direct-deduct Inventory Transaction Processing
发料单Disbursement List
派工单Dispatch List
分销资源计划Distribution Resource Planning (DRP)
鼓-缓冲-绳子Drum-buffer-rope
经济订货批量Economic Order Quantity (EOQ)
工程变更生效日期Engineering Change Effect Date
工程变更生效单Engineering Change Effect Work Order
工程停止日期Engineering Stop Date
例外控制Exception Control
呆滞材料分析Excess Material Analysis
急送代码Expedite Code
加工订单Fabrication Order
补足欠交Fill Backorder
总装提前期Final Assembly Lead Time
确认的计划订单Firm Planned Order
固定订货批量F ixed Order Quantity
集中预测Focus Forecasting
完全跟踪Full Pegging
通用生产管理原则Generally Accepted Manufacturing Practices
毛需求Gross Requirements
在制品库存In Process Inventory
独立需求Independent Demand
投入/产出控制Input/ Output Control
检验标识Inspection ID
厂际需求Interplant Demand
库存周转率Inventory Carry Rate
仓库库位类型Inventory Location Type
库存周转次数Inventory Turnover
发送订单Issue Order
项目记录Item Record
物料项目Item
加工车间Job Shop
准时制生产Just-in-time (JIT)
看板Kanban
人工工时Labor Hour
最后运输日期Last Shipment Date
提前期Lead Time
(资料整理:武汉九重歌翻译公司)武汉翻译 武汉翻译公司 武汉英文翻译 武汉光谷翻译公司